Technical Article

From rural roadmaps to national action: RENOVERTY’s lessons for Italy’s NBRP

RENOVERTY’s rural renovation roadmaps highlight the barriers energy-poor households face. This article explores how tailored finance, coordination and local support can help Italy’s National Building Renovation Plan address them.

Editorial Team

Authors

Pierpaolo Romano, AISFOR | LinkedIn profile

Mara Oprea, Institute for European Energy and Climate Policy (IEECP) | LinkedIn profile

(Note: Opinions in the articles are of the authors only and do not necessarily reflect the opinion of the European Union)


Introduction

Improving the energy performance of buildings is central to decarbonisation, but delivery depends on more than the availability of efficient technologies. For a household in a small rural municipality, renovating a home to meet modern energy performance standards often presents challenges specific to sparsely populated areas. These challenges are largely proximity-related and include the higher upfront costs of organising retrofit works far from major service centres, difficulty accessing trusted and qualified professionals, and reduced access to information about grants and local planning permissions, compounded by the administrative complexity of navigating these processes.

The recast Energy Performance of Buildings Directive (EU 2024/1275) requires Member States to prepare NBRPs, setting out milestones for 2030, 2040 and 2050, with final plans due by 31st December 2026. This article considers how evidence from the ground could strengthen Italy’s NBRP preparation and subsequent delivery. The Italian activities of RENOVERTY, undertaken in rural areas of the province of Parma, offer a useful case study.

 

What RENOVERTY delivered in Italy and why it matters for the NBRP

In the Parma pilot, RENOVERTY worked in the Val di Taro area, involving six neighbouring municipalities. Buildings were selected in cooperation with GAL del Ducato and ATES Parma. The selected buildings comprised three single-family buildings and five multi-family buildings. The project carried out several site visits and issued 24 energy performance certificates (EPCs).

The assessments identified generally poor energy performance, insufficient or absent insulation, ageing windows and, in many cases, outdated heating systems across the region, resulting in energy class G. The range of building types present in the region illustrates why renovation cannot follow a single template or general plan.

Alongside the energy audits, RENOVERTY used the DREEM (Dynamic high-Resolution dEmand-sidE Management) simulation model to compare the potential savings of different energy efficiency measures for the audited households. For the average single-family building modelled, annual energy use in the baseline scenario was approximately 27,931 kWh. A renovation scenario simulated the installation of roof insulation, which reduced the energy usage to 17,114.4 kWh, while a separate scenario with the installation of a heat pump yielded a reduction to 10,172.8 kWh.

 

Two line charts showing cumulative annual energy consumption for single-family and multi-family households in Parma, Italy, with heating, cooling and appliances, and total energy consumption under baseline scenarios.

Figure 1:  Cumulative annual consumption for the single-family household typology and multi-family household typology in the rural region of Parma in Italy (baseline scenario). Source: IEECP.

 

Two line charts comparing cumulative annual energy consumption for single-family and multi-family households in Parma, Italy, under baseline conditions and seven energy efficiency measures.

Figure 2: Cumulative annual energy consumption in Parma for single-family buildings and multi-family buildings across seven energy efficiency measures (EEMs). 

 

For the average multi-family building household in the same region, the baseline was approximately 25,856 kWh per year, compared with 17,432.6 kWh for wall insulation and 10,159.1 kWh for the installation of a heat pump.

These are separate modelled scenarios, not consumption measured after completed works; thus the savings figures must not be added together.

RENOVERTY’s added value lies in what happened after the technical assessment. The REERs translate evidence into guidance for households, policymakers and stakeholders. The technical REER for households helps residents understand the benefits and implications of possible works, explains financial support, and provides relevant contacts to aid households throughout the various stages of renovations. The high-level policymaker REER examines barriers to potential support measures for rural home renovation, suggesting implementation pathways for the actors who could put them into practice. These complementary perspectives are crucial for the NBRPs, as a strategy may be sound in energy terms, yet fail to reach its intended beneficiaries if it does not consider the pathway or local implementation. Three areas of policy improvement – multilevel coordination, tailored financing and implementation capacity – are therefore discussed below and can be integrated into the NBRPs to increase their effectiveness.

 

Multilevel coordination: who turns targets into local decisions?

The first area of improvement is related to governance. The NBRP can establish milestones, priorities and funding programmes, but renovating homes requires a chain of decisions involving owners, municipalities, technical professionals, contractors and, in some cases, social services and third sector entities. In rural areas, limited administrative capacity and dispersed settlements can make this chain particularly fragile. RENOVERTY therefore highlights the value of recognisable local intermediaries or facilitators who can build trust and connect technical energy information with knowledge of the community. 

The Parma experience illustrates how using the network of a Local Action Group (LAG), a local development partnership, can help reach property owners and local associations, while a territorial energy agency can contribute technical expertise and advisory services to rural citizens who do not have the knowledge or resources to begin the process. This cooperation supported the identification of buildings in need of home retrofits, while enabling energy assessments and discussion about suitable measures to take place in households that might otherwise not have been motivated to renovate. Integrating this process into the NBRP can help to increase renovation uptake and would mainly require linking national policy design with organisations able to follow renovation projects at the local level.

One implementation approach would be the development of territorial delivery agreements coordinated by regions or groups of municipalities, together with LAGs, energy agencies, and social organisations. National authorities would set targets and reporting responsibilities, while local partnerships would identify building groups, hard-to-reach households and local obstacles. Information should flow in both directions, and difficulties encountered during local delivery should inform the revision of national measures.

RENOVERTY also emphasises the benefit of co-creation. Stakeholders need to help identify barriers, test feasibility, and agree on who will implement the steps needed to provide more effective renovation support. Furthermore, the NBRP could ask delivery partnerships to report not only on buildings identified and prioritised for renovation, but also on why some renovation journeys fail to progress into works, so that policymakers can respond early and prevent such situations from recurring.

 

Tailored financing: from theoretical support to affordable investment

The second area for improvement concerns effective access to finance. A tax deduction or grant may appear as an adequate form of support for renovation on paper, but these remain unusable for households unable to cover upfront renovation costs, take on debt, or absorb unforeseen design and permitting costs. For the renovation measures recommended in the RENOVERTY EPCs, the Italian roadmap estimates an average renovation cost of approximately €29,500 per dwelling, with indicative amounts ranging from €13,000 to €52,000. These figures cannot be generalised, but their scale helps explain the gap between technical renovation potential and the investment capacity of a vulnerable household.

The economic simulations also show that the financial case varies substantially between measures. For the modelled single-family building, roof insulation has a positive net present value, whereas external wall insulation and window replacement are not financially attractive under the assumptions considered, without subsidies. This does not mean the latter measures should be ruled out. Rather, funding criteria need to reflect initial costs, expected savings and benefits for comfort and health, which are not fully captured by financial returns alone.

Three implications follow for Italy’s NBRP. First, financing mechanisms should be differentiated by household resources and vulnerability, with direct grants and advance payments available to households unable to meet upfront costs, combinations of incentives and affordable finance rates offered to households with greater capacity, and tailored support should be provided to multi-owner buildings and properties with technical constraints. Second, financial support should be paired with impartial advice to help households choose appropriate works. Third, predictability matters to households, since stable rules, clear timescales and straightforward checks can be as important as the headline value of an incentive.

The Italian policymaker REER considers options including preferential loans, guarantees, microcredit and other local financing arrangements. Descriptions of Italian incentives in the REER reflect the framework in place when it was written and should not be treated as a current guide to incentives available in Italy in 2026. The NBRP can instead adopt the policymaker roadmap’s approach to assessing the accessibility of financing solutions.

Resource allocation should also combine the energy performance of buildings with social circumstances. A low energy rating is not, by itself, proof of energy poverty, while a vulnerable household may live in a property affected by ownership or planning barriers. A single eligibility criterion could therefore favour applicants who are already well organised over those with the greatest needs. To reduce this risk, the Italian NBRP could encourage the tracking of funding reaching vulnerable households, applications that are abandoned before approval and the extent to which support leads to completed works, to ensure that financial support is tailored to household needs.

 

Implementation capacity: services, skills and sustained support

The third area of improvement concerns practical implementation. RENOVERTY shows that general information about incentives is insufficient when a household needs to find a contractor, compare quotes, check a building’s legal status, or obtain renovation permission. The Italian roadmap explicitly identifies administrative, financial, informational and community-related barriers, linking them to possible actions and responsible support actors. This is what distinguishes a list of policy measures from an implementation tool.

In the Parma area, engagement with households was built on the experience of ATES Parma and its Sportello Energia & Condomini (Energy and Condominiums Advice Service). Activities developed through RENOVERTY also included practical initiatives, such as RENOLABS and a Tool Bank at the Emporio Solidale in Borgotaro, intended to introduce residents to simple measures and energy-use monitoring. These activities do not replace deep renovation or demonstrate measured savings but provide an initial point of contact for households that might otherwise remain outside more complex renovation programmes.

A key lesson for the Italian NBRP is the value of establishing One-Stop Shops for renovation that provide end-to-end support rather than information alone. An effective service should help residents understand their energy needs, identify suitable measures, navigate building permits and restrictions, assess funding conditions and engage qualified professionals. For vulnerable households, this support should be free or affordable, with transparent standards for impartiality and advice quality.

Where services are located matters just as much. In dispersed rural settlements, a digital-only service risks reaching primarily those already well informed, while a permanent office in a larger town may be inaccessible to people without access to private transport. The NBRP could support flexible models of information delivery through regular advice sessions in smaller municipalities, itinerant support offices, partnerships with libraries and telephone access linked to a central specialist service. 

A capable network of professionals and contractors experienced in working with a diverse building stock is also essential. Where qualified local professionals are scarce, the cost of obtaining advice may rise, and delivery may be delayed. Continuing professional development and local networks connecting advice services, professional bodies, contractors and public authorities are therefore needed, alongside arrangements to check the quality of completed works.

Finally, progress needs to be measured throughout the renovation journey. The amount of funding allocated or the number of residents who have received information does not necessarily correspond to the number of homes that have actually been renovated. Monitoring should instead cover initial contacts, assessments, funding applications, approvals, work progress alongside reasons for renovation disruptions. Where feasible, energy performance should be compared before and after renovation using consistent methods, supplemented by indicators of comfort and affordability.

 

From evidence to a deliverable and verifiable NBRP

These three areas are interdependent. Effective local coordination that identifies buildings and households will achieve little without accessible financing. Attractive financial support may remain unused if reliable services are lacking. Even a competent advice service can stall when rules are uncertain or qualified professionals are unavailable. It is the connection between governance, finance and practical support that determines whether renovation policy results in completed works.

The 24 RENOVERTY audits in Italy and their energy simulations cannot describe Italy’s whole building stock. They do, however, offer a repeatable process that can be taken up within the NBRPs: start with diagnosing household needs and building characteristics, involve actors able to address the obstacles, define suitable works and financing routes, assign responsibilities and track where the process is likely to break down, so that these barriers can be addressed. In this sense, the REERs can help bridge the gap between national strategy and territorial delivery programmes, moving NBRPs from strategic documents towards operational roadmaps.

 

Conclusions

The value of Italy’s NBRP will lie not only in the decarbonisation targets it sets, but also in its ability to reach the buildings and households that are hardest to engage but would benefit the most from renovation. RENOVERTY’s Parma pilot shows that the energy renovation process must be supported by territorial governance, genuinely accessible finance and sustained advisory services. The policymaker roadmap offers a practical way to assign responsibilities, address barriers and measure progress. This approach is not limited to Italy. Guidance on how support measures can be modified to increase building renovation rates can also be found for Croatia, Estonia, Hungary, Slovenia, Spain and Portugal, and these approaches can inform support measures in the respective NBRPs. These delivery conditions need to be built into every NBRP from the outset, and with final plans due by 31 December 2026, there is still time to do so. Only then can national ambitions become a sequence of achievable, verifiable and socially equitable renovations that bring Europe’s decarbonisation goals within reach of every household.